Town of Weldon Public Works
Yard Debris Pickup Schedule PDF Print E-mail

Mondays

1st – 4th, Water, Mill, Smith, Washington Avenue, Maple Street, and Rockfish Drive

Tuesdays

Corbitt Drive, Mackie, Allen, Johnston Road, Snead, Daniels Street, Daniels Street Ext., Cherry Street, and County Road

Wednesdays

Chockoyotte, Brownell, Grant Drive, Holmes, Thomas, Winston, Woodruff, Prince, Fairground Lane, US 158, Stuart Circle, Longstreet Road, Lee Lane, Caroline Avenue, Shepherd Street and Chockoyotte Country Club Golf Course.

Thursdays

4th - 9th Streets, Elm, Sycamore and Washington Avenue

Fridays

4th – 9th Streets, Elm, Maple, Sycamore, Cedar, Willow Drive, Maple Drive, Woodlawn Avenue, Sunset Drive, Fewell Avenue and Meadow Lane

Leaf Pick Up

Leaves, grass clippings and pine straw should be bagged EXCEPT October 15th – February 15th

The Town of Weldon holds CLEAN UP WEEK twice a year.  (Spring & Fall)  Dates will be announced.

 
Water & Sewer Deposit/Fee Information PDF Print E-mail

Administrative business, such as bill payments, inquires, and applications, etc. are conducted at the Town Hall in Weldon from 9:00a.m to 5:00p.m. Monday – Friday.

Phone calls will be accepted until 5:00p.m. on those days for your convenience and payments can still be made in the drop box located on the right hand side of the front door.

Read more... [Water & Sewer Deposit/Fee Information]
 
Town of Weldon Sewer Department PDF Print E-mail

The Town of Weldon owns and operates a 1.2 Million Gallons per Day (MGD) Wastewater Treatment Plant. The original wastewater treatment plant was built in 1960. A new 0.6 MGD wastewater treatment plant was built in 1986 and the original plant was demolished. The plant was expanded to its present 1.2 MGD in 1996.

Read more... [Town of Weldon Sewer Department]
 
Town of Weldon Water Department PDF Print E-mail

The Town of Weldon owns & operates a 2.0 Million Gallons per Day (MGD) conventional surface water treatment plant. The Town utilizes the Roanoke River as our water source. The original Water Treatment Plant was built in the late 1800’s with the existing building erected in the early to mid 1930’s. The last major upgrade to the plant was in 1980.

Read more... [Town of Weldon Water Department]
 


Who's Online

We have 46 guests online
Banner